Étude de la superstructure d'un pont droit à poutres multiples en béton précontraint

dc.contributor.authorHamdi, Mohamed Aissa
dc.contributor.authorTaleb Bahmed, Mohamed
dc.contributor.authorAmara, Saleh, Directeur de thèse
dc.date.accessioned2023-02-19T07:26:25Z
dc.date.available2023-02-19T07:26:25Z
dc.date.issued2018
dc.descriptionLaghouat : Université Amar Telidji - Département de génie civil Option : Voies et ouvrages d'art
dc.description.abstractThe aim of our work is to study a post-tensioned pre-stressed concrete multi-beam bridge with a total length of 134 m and a width of 10 m. The deck consists of 4 spans with 7 main beams per span, supported by 3 intermediate piles and two abutments at the ends. The beams are surmounted by a reinforced concrete slab. The study of the deck was carried out using the ROBOT STRUCTURAL ANALYSIS 2015 calculation software. On the basis of the results obtained on the transverse and longitudinal distribution of the loads and overloads applied on the deck, the design of the different elements constituting the deck namely the layout of the pre-stressing cables, the reinforcement of the beams , the slab and the end cross-beams and the design of the support devices, have been carried out
dc.identifier.urihttps://dspace.lagh-univ.dz/handle/123456789/5258
dc.language.isofr
dc.titleÉtude de la superstructure d'un pont droit à poutres multiples en béton précontraint
dc.typeThesis

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Hamdi, Mohamed Aissa
Size:
8.76 MB
Format:
Adobe Portable Document Format

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed to upon submission
Description: